Aluminum alloy formwork construction process:
1. Mark the wall column lines, wall column control lines, and opening lines on the floor, with the wall column control line 200mm away from the wall edge line, to check whether the template is offset and square; Mark the floor elevation control points on the longitudinal bars of the columns, and set them at the four corners and corners of the walls and columns to check the floor elevation.
2. Install wall and column reinforcement, pre embedded water and electricity boxes, conduit, reserved openings, etc. After completion, handle the concealed engineering acceptance procedures.
3. Install wall column formwork
previous page
next page
previous page
next page
— Related Case —
Zhengzhou Vanke City Phase I
Chongqing Vanke Fengtian Road Project Phase II
Chongqing Vanke High Ninth Road Project
Chongqing Vanke Jiangbei Galanxi Cluster Land Phase I
Wantai Construction Convex Window PC Component Mold
Prefabricated staircase formwork of China Construction Third Engineering Bureau