09 Floor reinforcement binding and water and electricity installation
2024-06-29
10. Pouring concrete
11.The next day, remove the wall panels
12. Transfer the removed wall panels through the feeding port
13.On the third day, remove the beams, slabs, and floor slabs
14.After the aluminum template is transferred, the mold assembly can begin
01 Acceptance of raw material warehouse
02 Aluminum profile cutting